LEVELOG · CONSTRUCTION PROGRESS REPORT

Harbor Row Tower

Harbor Row, Brooklyn, NY (demo job) · Demo General Contractor

Jul 1 – Sep 30, 2026

Quarterly · prepared Oct 1, 2026

High riskSet by the highest risk in this report. Not a judgment of schedule, cost or quality.

  • 57 / 57Working days with site activity
  • 26Average workers on site per day
  • 34Peak workforce · Sep 1
  • 6Subcontractors on site

First risk in this report HIGH 1 DOB/DOT violation or complaint open: DOB violation DEMO-ECB-0355.R1

Overview

The badge beside the dates is set by the highest risk in this report. It is not a judgment of schedule, cost or quality.

6 subcontractors worked on site on 57 of 57 working days, averaging 26 workers a day with a peak of 34 on Tue Sep 1.

Reported work — Kestrel Concrete: formwork on Top deck; Summit Hoist: hoist operation on Site; Northline Mechanical: return ductwork on floors 1–9; Tidewater Fire Protection: branch lines on floors 1–8.

Regulatory — 1 DOB/DOT violation or complaint open and 3 records issued in the period.

Schedule — per the project schedule dated Sep 30, 2026: 12 of 40 scheduled activities complete and forecast finish Sep 13, 2027 against an original Sep 6, 2027.

Progress — concrete in progress; HVAC / ductwork rough-in appears complete on floors 1–8, in progress on floor 9; sprinklers rough-in appears complete on floors 1–7, in progress on floor 8; electrical rough-in appears complete on floors 1–7 (and 1 more kind of work on the progress page), as read from the daily logs.

Workers on site

Workers on site, weekly average

See this in the PDF

Changes, risks and what is coming up

Changes since the previous period
  • 2 new DOB/DOT records issued: DOB violation DEMO-ECB-0355 and DOB complaint DEMO-C-4390.R1R3
  • 1 milestone completed per the schedule: Superstructure to floor 10.S
Risks and watch items
  • HIGH 1 DOB/DOT violation or complaint open: DOB violation DEMO-ECB-0355.R1
  • HIGH 8 daily inspection items recorded as failed in the daily logs: Fall protection (Aug 19), Fall protection (Aug 4), Fall protection (Sep 21) and 5 more.L
Progress (estimated) L

HVAC / ductwork rough-in — about 40%

Sprinklers rough-in — about 35%

Electrical rough-in — about 30%

Windows — about 20%

Estimated from the filed daily logs; see the progress page.

Schedule S

12 of 40 activities complete (count, not a percent)
Finish Sep 13, 2027 vs original Sep 6, 2027 (+7 days)

Per schedule data date Sep 30, 2026

See this in the PDF

Progress by trade and floor (estimated)L

An estimate, read from the lines of the filed daily logs. With a confirmed schedule it is counted over the floors that file names; the count behind each percent is printed beside it. The demo logs carry no photographs, so this sample has no photo page.

How far each kind of work has got on each floor, read from the filed daily logs up to Sep 30, 2026. Week by week: the estimate at the end of each of the last 12 weeks, read from the logs filed up to that day.

Concrete Kestrel Concrete

    not tied to a floor In progress at Top deck

    Concrete (Kestrel Concrete): in progress at Top deck.

    HVAC / ductwork rough-in Northline Mechanical

    1. Floor 1: Done
    2. Floor 2: Done
    3. Floor 3: Done
    4. Floor 4: Done
    5. Floor 5: Done
    6. Floor 6: Done
    7. Floor 7: Done
    8. Floor 8: Done
    9. Floor 9: Active
    10. Floor 10: not reported
    11. Floor 11: not reported
    12. Floor 12: not reported
    13. Floor 13: not reported
    14. Floor 14: not reported
    15. Floor 15: not reported
    16. Floor 16: not reported
    17. Floor 17: not reported
    18. Floor 18: not reported
    19. Floor 19: not reported
    20. Floor 20: not reported
    21. Floor 21: not reported
    22. Floor 22: not reported

    about 40%Week by week

    HVAC / ductwork rough-in (Northline Mechanical): appears complete on floors 1–8; in progress on floor 9; not yet reported on floors 10–22. 8 of 22 floors appear complete, 1 under way.

    Sprinklers rough-in Tidewater Fire Protection

    1. Floor 1: Done
    2. Floor 2: Done
    3. Floor 3: Done
    4. Floor 4: Done
    5. Floor 5: Done
    6. Floor 6: Done
    7. Floor 7: Done
    8. Floor 8: Active
    9. Floor 9: not reported
    10. Floor 10: not reported
    11. Floor 11: not reported
    12. Floor 12: not reported
    13. Floor 13: not reported
    14. Floor 14: not reported
    15. Floor 15: not reported
    16. Floor 16: not reported
    17. Floor 17: not reported
    18. Floor 18: not reported
    19. Floor 19: not reported
    20. Floor 20: not reported
    21. Floor 21: not reported
    22. Floor 22: not reported

    about 35%Week by week

    Sprinklers rough-in (Tidewater Fire Protection): appears complete on floors 1–7; in progress on floor 8; not yet reported on floors 9–22. 7 of 22 floors appear complete, 1 under way.

    Electrical rough-in Brightway Electric

    1. Floor 1: Done
    2. Floor 2: Done
    3. Floor 3: Done
    4. Floor 4: Done
    5. Floor 5: Done
    6. Floor 6: Done
    7. Floor 7: Done
    8. Floor 8: not reported
    9. Floor 9: not reported
    10. Floor 10: not reported
    11. Floor 11: not reported
    12. Floor 12: not reported
    13. Floor 13: not reported
    14. Floor 14: not reported
    15. Floor 15: not reported
    16. Floor 16: not reported
    17. Floor 17: not reported
    18. Floor 18: not reported
    19. Floor 19: not reported
    20. Floor 20: not reported
    21. Floor 21: not reported
    22. Floor 22: not reported

    about 30%Week by week

    Electrical rough-in (Brightway Electric): appears complete on floors 1–7; not yet reported on floors 8–22. 7 of 22 floors appear complete.

    Windows Clearspan Glazing

    1. Floor 1: Done
    2. Floor 2: Done
    3. Floor 3: Done
    4. Floor 4: Done
    5. Floor 5: Active
    6. Floor 6: not reported
    7. Floor 7: not reported
    8. Floor 8: not reported
    9. Floor 9: not reported
    10. Floor 10: not reported
    11. Floor 11: not reported
    12. Floor 12: not reported
    13. Floor 13: not reported
    14. Floor 14: not reported
    15. Floor 15: not reported
    16. Floor 16: not reported
    17. Floor 17: not reported
    18. Floor 18: not reported
    19. Floor 19: not reported
    20. Floor 20: not reported
    21. Floor 21: not reported
    22. Floor 22: not reported

    about 20%Week by week

    Windows (Clearspan Glazing): appears complete on floors 1–4; in progress on floor 5; not yet reported on floors 6–22. 4 of 22 floors appear complete, 1 under way.

    Done — appears completeActive — worked in the last 7 daysStarted — worked earlierNot reported on that floor

    How the estimate is made. Estimated from the filed daily logs: on each floor, work the log reports as complete, or that the next trade in sequence has followed (and the crew has not returned to in a week), counts as complete; work reported on that floor counts as half done; a floor that no log line names for that work counts as not started. Not measured on site and not taken from a schedule. Counted over 22 floors: the 9 a filed daily log has named and 13 more that the confirmed schedule file names (floors 10–22).

    See this in the PDF

    Crews on site, day by dayGL

    Who worked when, and what they reported, from site check-ins and filed daily logs. A bar is days on site, not measured completion.

    • Kestrel Concrete ConcreteFormwork, rebar, concrete pour, core walls

      57 days
    • Summit Hoist Hoist and safetyHoist operation, safety watch

      57 days
    • Northline Mechanical HVACReturn ductwork, supply · floors 1–9

      43 days
    • Tidewater Fire Protection SprinklerBranch lines, sprinkler mains · floors 1–8

      39 days
    • Brightway Electric ElectricalConduit, electrical rough-in · floors 1–7

      35 days
    • Clearspan Glazing WindowsCurtain wall panels, window installation · floors 1–5

      21 days

    A coloured bar: days on site, in the subcontractor's colour. A weekend between two worked days does not break the bar; a working day with nobody there does.

    See this in the PDF

    Schedule and completionS

    Planned vs actual: when you import and confirm your schedule. The dates are the file’s own. A milestone that is not complete shows its current date; a shift under 7 days is in the milestone table only.

    Per Harbor Row Tower Master Schedule.xlsx, data date Sep 30, 2026, confirmed by Project manager (demo). Completion figures are those the schedule itself reports; Levelog does not estimate completion.

    Milestones
    MilestoneOriginalCurrent, or actual if completeStatus
    Superstructure to floor 10Sep 21, 2026Sep 21, 2026COMPLETE
    Schedule changes shown in the file
    ActivityOriginalCurrentShift
    Permanent powerNov 6Dec 4+28 d
    Hoist removalMar 10Mar 17+7 d
    Substantial completionSep 6Sep 13+7 d
    Topping outDec 10Dec 17+7 d

    Finish or start dates 7 days or more later than the original; smaller shifts are in the milestone table and the schedule file. Dates as they appear in the schedule file; no cause is inferred.

    Scheduled for this period vs. reported
    Scheduled in the schedule
    • Concrete floor 1 (Jul 13–Jul 17)
    • Concrete floor 2 (Jul 20–Jul 24)
    • Concrete floor 3 (Jul 27–Jul 31)
    • Concrete floor 4 (Aug 3–Aug 7)
    • and 13 more scheduled in this period
    Reported in daily logs
    • Kestrel Concrete: Formwork
    • Summit Hoist: Hoist operation
    • Northline Mechanical: Return ductwork
    • Tidewater Fire Protection: Branch lines
    • Brightway Electric: Conduit
    • Clearspan Glazing: Curtain wall panels

    Shown side by side for comparison; the report draws no conclusion from differences in wording.

    By floor (activities named for a floor)
    • Floors 1–9 1 of 1 complete on each
    • Floor 10 2 of 2 complete
    • Floor 11 1 of 1 complete
    • Floors 12–14 0 of 1 complete on each
    • Floors 15–19 0 of 1 complete on each
    • Floor 20 0 of 2 complete
    • Floors 21–22 0 of 1 complete on each

    See this in the PDF

    Workforce and site activityG

    Workers counted once per day from site check-ins; working days are weekdays, excluding U.S. federal holidays, from the first recorded activity.

    • Kestrel Concrete Concrete

      Days on site 57Avg workers 13.4Peak 14

    • Summit Hoist Hoist and safety

      Days on site 57Avg workers 2Peak 2

    • Northline Mechanical HVAC · floors 1–9

      Days on site 43Avg workers 4.8Peak 5

    • Tidewater Fire Protection Sprinkler · floors 1–8

      Days on site 39Avg workers 3.8Peak 4

    • Brightway Electric Electrical · floors 1–7

      Days on site 35Avg workers 4.8Peak 5

    • Clearspan Glazing Windows · floors 1–5

      Days on site 21Avg workers 3.8Peak 4

    See this in the PDF

    Regulatory and material risksR

    The report names the city records that are open, new, changed or expiring soon. Open violations and open complaints are counted together. The app’s city screen lists every record on the address.

    DOB/DOT feed checked Oct 1, 2026.

    RecordNumberIssuedStatus at period end
    DOB violationDEMO-ECB-0355Sep 2, 2026OPEN R1
    DOT permitDEMO-DOT-2201Sep 14, 2026ISSUEDR2
    DOB complaintDEMO-C-4390Aug 19, 2026CLOSED R3
    DOB permitB00DEMO05-S1Nov 24, 2025ISSUED — expires Nov 24, 2026R4

    Listed: records open at the end of the period, records issued or changed during it, and permits that expire within 60 days of its end. A permit in force that expires later is not listed.

    Daily site inspections L

    285 inspection items were walked on 57 days; 277 passed, 8 failed. Failed: Fall protection (Sep 21), Perimeter fence (Sep 11), Fall protection (Sep 3), Fall protection (Aug 19), Perimeter fence (Aug 18), Fall protection (Aug 4) and 2 earlier in the period.

    See this in the PDF

    Basis, data notes and evidence

    A source tag anywhere in this sample opens its line of this index. It is the report’s own index: in the product a city record links to the city’s site, and a log is cited by date and id, not linked.

    How to read the progress in this report. Documented — work the subs reported in daily logs. Estimated — the stages and percentages on the progress page, read from those logs by the fixed rules printed there. Measurable — counts or a percent exactly as a confirmed schedule file states them. Verified physical progress — not claimed: nothing here is independently verified on site, and no figure is calculated from headcount.

    What this report does not contain
    • Progress stages and estimates are read from the filed daily logs by the fixed rules on the progress page. They are not measured or independently verified on site, and no figure is derived from headcount.
    • Photographs are supplied in the filed daily logs; their location and date are as filed and are not independently verified.
    • Internal GC coordination (messages, reminders, punch-list assignments, free-text site observations) and individual worker information are not included in this report.
    Data notes
    • Daily logs were filed for 57 of the 57 days with site activity.
    • Working days exclude Labor Day (Sep 7).
    Evidence index
    • GSite check-ins1480 check-in records, Jul 1–Sep 30 (NFC / QR gate; one worker counts once a day)
    • LFiled daily logs57 daily jobsite logs filed in the periodJul 13 (d92192), Jul 14 (95f23e), Jul 15 (41ef07), Jul 16 (f34c24), Jul 17 (ee2ef6), Jul 20 (3f5743), Jul 21 (03e9bb), Jul 22 (12af70), Jul 23 (fa889f), Jul 24 (2dfe9b), Jul 27 (9c9302), Jul 28 (b43b91), Jul 29 (32806f), Jul 30 (a4251e), Jul 31 (c7a79a), Aug 3 (ab6ca6), Aug 4 (7a16d7), Aug 5 (dacafa), Aug 6 (d76fcc), Aug 7 (0bbc9d), Aug 10 (d5c003), Aug 11 (1e26e6), Aug 12 (c3d509), Aug 13 (2117d3) … +33 more
    • R1DOB violation DEMO-ECB-0355DOB record; status ACTIVE a810-bisweb.nyc.gov
    • R2DOT permit DEMO-DOT-2201DOT record; status ISSUED
    • R3DOB complaint DEMO-C-4390DOB record; status CLOSED a810-bisweb.nyc.gov
    • R4DOB permit B00DEMO05-S1DOB record; status ISSUED a810-bisweb.nyc.gov
    • SProject scheduleHarbor Row Tower Master Schedule.xlsx, data date Sep 30, 2026, confirmed by Project manager (demo)

    site check-ins ·filed daily logs ·DOB/DOT record ·project schedule

    Generated October 1, 2026 8:00 AM ET · engine 2026.11.2 · reference 7438afd9cb · report demo-qua. The facts printed here are stored with the report.

    See this in the PDF

    Sample report. Words and numbers are the report engine’s output on demo data, laid out here for the web. The product sends it as a PDF.