LEVELOG · CONSTRUCTION PROGRESS REPORT
Harbor Row Tower
Harbor Row, Brooklyn, NY (demo job) · Demo General Contractor
Nov 5–18, 2026
High riskSet by the highest risk in this report. Not a judgment of schedule, cost or quality.
- 9 / 9Working days with site activity
- 31Average workers on site per day▼ 1.1 vs previous (32.1)
- 34Peak workforce · Nov 13
- 6Subcontractors on site
First risk in this report HIGH 3 DOB/DOT violations or complaints open: DOB violation DEMO-ECB-0412, DOB complaint DEMO-C-4471 and DOB violation DEMO-ECB-0398.
Overview
The badge beside the dates is set by the highest risk in this report. It is not a judgment of schedule, cost or quality.
6 subcontractors worked on site on 9 of 9 working days, averaging 31 workers a day with a peak of 34 on Fri Nov 13. That is in line with the previous period (32.1 a day).
Reported work — Kestrel Concrete: formwork on Top deck; Brightway Electric: conduit on floors 12–14; Northline Mechanical: return ductwork on floors 14–16; Clearspan Glazing: curtain wall panels on floors 10–11.
Regulatory — 3 DOB/DOT violations or complaints open and 2 records issued in the period.
Schedule — per the project schedule dated Nov 17, 2026: 22 of 40 scheduled activities complete and forecast finish Sep 13, 2027 against an original Sep 6, 2027.
Progress — concrete in progress; electrical rough-in appears complete on floors 1–7 and 9–12, in progress on floors 13–14; HVAC / ductwork rough-in appears complete on floors 1–15, in progress on floor 16; windows appears complete on floors 1–6 and 8–10, in progress on floor 11 (and 1 more kind of work on the progress page), as read from the daily logs.
Workers on site
Workers on site, per working daySame position in the previous period
Changes, risks and what is coming up
Changes since the previous period
- 2 new DOB/DOT records issued: DOB violation DEMO-ECB-0412 and DOB complaint DEMO-C-4471.
- 1 violation resolved: DOB violation DEMO-ECB-0355.
Risks and watch items
- HIGH 3 DOB/DOT violations or complaints open: DOB violation DEMO-ECB-0412, DOB complaint DEMO-C-4471 and DOB violation DEMO-ECB-0398.
- HIGH 1 daily inspection item recorded as failed in the daily logs: Fall protection (Nov 6).
- WATCH Permit expiring within 30 days: DOB permit B00DEMO05-S1 (Nov 24, 2026).
Coming up (next 30 days)
- Tue Nov 24 — DOB permit B00DEMO05-S1 expires
- Thu Dec 3 — Milestone: Superstructure to floor 20
- Fri Dec 4 — Milestone: Permanent power
- Tue Dec 8 — OATH hearing, violation DEMO-ECB-0412
- Thu Dec 17 — Milestone: Topping out
Progress (estimated)
Electrical rough-in — about 55%
HVAC / ductwork rough-in — about 70%
Windows — about 45%
Sprinklers rough-in — about 65%
Estimated from the filed daily logs; see the progress page.
Schedule
22 of 40 activities complete (count, not a percent)
Finish Sep 13, 2027 vs original Sep 6, 2027 (+7 days)
Per schedule data date Nov 17, 2026
Progress by trade and floor (estimated)
An estimate, read from the lines of the filed daily logs. With a confirmed schedule it is counted over the floors that file names; the count behind each percent is printed beside it. The demo logs carry no photographs, so this sample has no photo page.
How far each kind of work has got on each floor, read from the filed daily logs up to Nov 18, 2026. Week by week: the estimate at the end of each of the last 12 weeks, read from the logs filed up to that day.
Concrete Kestrel Concrete
not tied to a floor In progress at Top deck
Concrete (Kestrel Concrete): in progress at Top deck.
Electrical rough-in Brightway Electric
- Floor 1: Done
- Floor 2: Done
- Floor 3: Done
- Floor 4: Done
- Floor 5: Done
- Floor 6: Done
- Floor 7: Done
- Floor 8: Started
- Floor 9: Done
- Floor 10: Done
- Floor 11: Done
- Floor 12: Done
- Floor 13: Active
- Floor 14: Active
- Floor 15: not reported
- Floor 16: not reported
- Floor 17: not reported
- Floor 18: not reported
- Floor 19: not reported
- Floor 20: not reported
- Floor 21: not reported
- Floor 22: not reported
about 55%Week by week
Electrical rough-in (Brightway Electric): appears complete on floors 1–7 and 9–12; in progress on floors 13–14; started earlier on floor 8; not yet reported on floors 15–22. 11 of 22 floors appear complete, 3 under way.
HVAC / ductwork rough-in Northline Mechanical
- Floor 1: Done
- Floor 2: Done
- Floor 3: Done
- Floor 4: Done
- Floor 5: Done
- Floor 6: Done
- Floor 7: Done
- Floor 8: Done
- Floor 9: Done
- Floor 10: Done
- Floor 11: Done
- Floor 12: Done
- Floor 13: Done
- Floor 14: Done
- Floor 15: Done
- Floor 16: Active
- Floor 17: not reported
- Floor 18: not reported
- Floor 19: not reported
- Floor 20: not reported
- Floor 21: not reported
- Floor 22: not reported
about 70%Week by week
HVAC / ductwork rough-in (Northline Mechanical): appears complete on floors 1–15; in progress on floor 16; not yet reported on floors 17–22. 15 of 22 floors appear complete, 1 under way.
Windows Clearspan Glazing
- Floor 1: Done
- Floor 2: Done
- Floor 3: Done
- Floor 4: Done
- Floor 5: Done
- Floor 6: Done
- Floor 7: Started
- Floor 8: Done
- Floor 9: Done
- Floor 10: Done
- Floor 11: Active
- Floor 12: not reported
- Floor 13: not reported
- Floor 14: not reported
- Floor 15: not reported
- Floor 16: not reported
- Floor 17: not reported
- Floor 18: not reported
- Floor 19: not reported
- Floor 20: not reported
- Floor 21: not reported
- Floor 22: not reported
about 45%Week by week
Windows (Clearspan Glazing): appears complete on floors 1–6 and 8–10; in progress on floor 11; started earlier on floor 7; not yet reported on floors 12–22. 9 of 22 floors appear complete, 2 under way.
Sprinklers rough-in Tidewater Fire Protection
- Floor 1: Done
- Floor 2: Done
- Floor 3: Done
- Floor 4: Done
- Floor 5: Done
- Floor 6: Done
- Floor 7: Done
- Floor 8: Done
- Floor 9: Done
- Floor 10: Done
- Floor 11: Done
- Floor 12: Done
- Floor 13: Done
- Floor 14: Done
- Floor 15: Active
- Floor 16: not reported
- Floor 17: not reported
- Floor 18: not reported
- Floor 19: not reported
- Floor 20: not reported
- Floor 21: not reported
- Floor 22: not reported
about 65%Week by week
Sprinklers rough-in (Tidewater Fire Protection): appears complete on floors 1–14; in progress on floor 15; not yet reported on floors 16–22. 14 of 22 floors appear complete, 1 under way.
Done — appears completeActive — worked in the last 7 daysStarted — worked earlierNot reported on that floor
How the estimate is made. Estimated from the filed daily logs: on each floor, work the log reports as complete, or that the next trade in sequence has followed (and the crew has not returned to in a week), counts as complete; work reported on that floor counts as half done; a floor that no log line names for that work counts as not started. Not measured on site and not taken from a schedule. Counted over 22 floors: the 16 a filed daily log has named and 6 more that the confirmed schedule file names (floors 17–22).
Crews on site, day by day
Who worked when, and what they reported, from site check-ins and filed daily logs. A bar is days on site, not measured completion.
Brightway Electric ElectricalConduit, electrical rough-in · floors 12–14
9 daysClearspan Glazing WindowsCurtain wall panels, window installation · floors 10–11
9 daysKestrel Concrete ConcreteFormwork, rebar, concrete pour, core walls
9 daysNorthline Mechanical HVACReturn ductwork, supply · floors 14–16
9 daysSummit Hoist Hoist and safetyHoist operation, safety watch
9 daysTidewater Fire Protection SprinklerBranch lines, sprinkler mains · floors 13–15
8 days
A coloured bar: days on site, in the subcontractor's colour. A weekend between two worked days does not break the bar; a working day with nobody there does.
Schedule and completion
Planned vs actual: when you import and confirm your schedule. The dates are the file’s own. A milestone that is not complete shows its current date; a shift under 7 days is in the milestone table only.
Per Harbor Row Tower Master Schedule.xlsx, data date Nov 17, 2026, confirmed by Project manager (demo). Completion figures are those the schedule itself reports; Levelog does not estimate completion.
Milestones
| Milestone | Original | Current, or actual if complete | Status |
|---|---|---|---|
| Superstructure to floor 20 | Dec 1, 2026 | Dec 3, 2026 | UPCOMING |
| Permanent power | Nov 6, 2026 | Dec 4, 2026 | UPCOMING |
| Topping out | Dec 10, 2026 | Dec 17, 2026 | UPCOMING |
Schedule changes shown in the file
| Activity | Original | Current | Shift |
|---|---|---|---|
| Permanent power | Nov 6 | Dec 4 | +28 d |
| Hoist removal | Mar 10 | Mar 17 | +7 d |
| Substantial completion | Sep 6 | Sep 13 | +7 d |
| Topping out | Dec 10 | Dec 17 | +7 d |
Finish or start dates 7 days or more later than the original; smaller shifts are in the milestone table and the schedule file. Dates as they appear in the schedule file; no cause is inferred.
Scheduled for this period vs. reported
Scheduled in the schedule
- Curtain wall floors 1-8 (Sep 15–Nov 10)
- Ductwork floors 9-16 (Oct 6–Dec 3)
- Sprinkler floors 9-16 (Oct 14–Dec 10)
- Electrical rough-in floors 9-16 (Oct 21–Dec 17)
- and 3 more scheduled in this period
Reported in daily logs
- Kestrel Concrete: Formwork
- Brightway Electric: Conduit
- Northline Mechanical: Return ductwork
- Clearspan Glazing: Curtain wall panels
- Summit Hoist: Hoist operation
- Tidewater Fire Protection: Branch lines
Shown side by side for comparison; the report draws no conclusion from differences in wording.
By floor (activities named for a floor)
- Floors 1–9 1 of 1 complete on each
- Floor 10 2 of 2 complete
- Floors 11–14 1 of 1 complete on each
- Floors 15–17 1 of 1 complete on each
- Floors 18–19 0 of 1 complete on each
- Floor 20 0 of 2 complete
- Floors 21–22 0 of 1 complete on each
Workforce and site activity
Workers counted once per day from site check-ins; working days are weekdays, excluding U.S. federal holidays, from the first recorded activity.
Kestrel Concrete Concrete
Days on site 9 (previous 10)Avg workers 12.3 (previous 12.9)Peak 14
Brightway Electric Electrical · floors 12–14
Days on site 9 (previous 10)Avg workers 4.8 (previous 4.8)Peak 5
Northline Mechanical HVAC · floors 14–16
Days on site 9 (previous 10)Avg workers 4.8 (previous 4.8)Peak 5
Clearspan Glazing Windows · floors 10–11
Days on site 9 (previous 10)Avg workers 3.8 (previous 3.8)Peak 4
Summit Hoist Hoist and safety
Days on site 9 (previous 10)Avg workers 2 (previous 2)Peak 2
Tidewater Fire Protection Sprinkler · floors 13–15
Days on site 8 (previous 10)Avg workers 3.8 (previous 3.8)Peak 4
Regulatory and material risks
The report names the city records that are open, new, changed or expiring soon. Open violations and open complaints are counted together. The app’s city screen lists every record on the address.
DOB/DOT feed checked Nov 18, 2026.
| Record | Number | Issued | Status at period end | |
|---|---|---|---|---|
| DOB violation | DEMO-ECB-0412 | Nov 16, 2026 | OPEN | |
| DOB complaint | DEMO-C-4471 | Nov 12, 2026 | OPEN | |
| DOB violation | DEMO-ECB-0398 | Oct 20, 2026 | OPEN | |
| DOB violation | DEMO-ECB-0355 | Sep 2, 2026 | CLOSED — was ACTIVE, changed Nov 9, 2026 | |
| DOB permit | B00DEMO05-S1 | Nov 24, 2025 | ISSUED — expires Nov 24, 2026 | |
| DOT permit | DEMO-DOT-2201 | Sep 14, 2026 | ISSUED — expires Jan 14, 2027 |
Listed: records open at the end of the period, records issued or changed during it, and permits that expire within 60 days of its end. A permit in force that expires later is not listed.
Daily site inspections
40 inspection items were walked on 8 days; 39 passed, 1 failed. Failed: Fall protection (Nov 6).
Basis, data notes and evidence
A source tag anywhere in this sample opens its line of this index. It is the report’s own index: in the product a city record links to the city’s site, and a log is cited by date and id, not linked.
How to read the progress in this report. Documented — work the subs reported in daily logs. Estimated — the stages and percentages on the progress page, read from those logs by the fixed rules printed there. Measurable — counts or a percent exactly as a confirmed schedule file states them. Verified physical progress — not claimed: nothing here is independently verified on site, and no figure is calculated from headcount.
What this report does not contain
- Progress stages and estimates are read from the filed daily logs by the fixed rules on the progress page. They are not measured or independently verified on site, and no figure is derived from headcount.
- Photographs are supplied in the filed daily logs; their location and date are as filed and are not independently verified.
- Internal GC coordination (messages, reminders, punch-list assignments, free-text site observations) and individual worker information are not included in this report.
Data notes
- Daily logs were filed for 8 of the 9 days with site activity (no filed log on Nov 13).
- Working days exclude Veterans Day (Nov 11).
Evidence index
- GSite check-ins279 check-in records, Nov 5–18 (NFC / QR gate; one worker counts once a day)
- LFiled daily logs8 daily jobsite logs filed in the periodNov 5 (d87add), Nov 6 (f4c452), Nov 9 (91f974), Nov 10 (7e5d22), Nov 12 (836c4e), Nov 16 (b3c10a), Nov 17 (9dc030), Nov 18 (cf9b01)
- R1DOB violation DEMO-ECB-0412DOB record; status ACTIVE a810-bisweb.nyc.gov
- R2DOB complaint DEMO-C-4471DOB record; status ACTIVE a810-bisweb.nyc.gov
- R3DOB violation DEMO-ECB-0398DOB record; status ACTIVE a810-bisweb.nyc.gov
- R4DOB violation DEMO-ECB-0355DOB record; status RESOLVED a810-bisweb.nyc.gov
- R5DOB permit B00DEMO05-S1DOB record; status ISSUED a810-bisweb.nyc.gov
- R6DOT permit DEMO-DOT-2201DOT record; status ISSUED
- SProject scheduleHarbor Row Tower Master Schedule.xlsx, data date Nov 17, 2026, confirmed by Project manager (demo)
site check-ins ·filed daily logs ·DOB/DOT record ·project schedule
Generated November 18, 2026 6:00 PM ET · engine 2026.11.2 · reference 2726ae818c · report demo-ond. The facts printed here are stored with the report.
Sample report. Words and numbers are the report engine’s output on demo data, laid out here for the web. The product sends it as a PDF.